Oiled Leather Braided Long Lead

¥8,300
  • A highly durable and flexible natural oiled rawhide leather long lead  imported from Holland
  • Designed with maximum comfort and flexibility in mind and finished with a braided design
  • The leather is single-layered with no stitching to further promote the flexibility of the product
  • Features snap hooks and rings with a premium matte black finish and the 'free stitch' logo allowing a wide variety of coordination with other products

Color
  • Black
Size
  Neck
Weight Width
S
180cm
90g
10mm
M
180cm
110g
12mm
L
180cm
130g
15mm
LL
180cm
155g
18mm
Materials
  • Rawhide leather
Country of Origin
  • Made in Holland
Points to Notes
  • Please note that this product is made from 100% natural oiled rawhide leather and so may display slight fraying or feathering along the edges when first purchased - this is a result of the cutting process for flexible oiled leather and does not indicate a defect
  • For maximum results, we recommend hand-wiping down the leather before use
  • We recommend choosing a lead together with collars of the same size (width) in the same product range.
    When using this lead together with products from another range or with third party products, please check the compatibility (twist and tension) of the fittings before use.