- A highly durable and flexible natural oiled rawhide leather long lead imported from Holland
- Designed with maximum comfort and flexibility in mind and finished with a braided design
- The leather is single-layered with no stitching to further promote the flexibility of the product
- Features snap hooks and rings with a premium matte black finish and the 'free stitch' logo allowing a wide variety of coordination with other products
Color |
|
||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Size |
|
||||||||||||||||||||
Material |
|
||||||||||||||||||||
Country of Origin |
|
||||||||||||||||||||
Points to Note |
|